Skip to content
Mission Control

Free tools Wrap rate calculator

What does one hour of labor really cost?

A wrap rate is the multiplier from a direct labor rate to the rate you bill. Enter your percentages, or enter a year of dollars and we work the percentages out. Every step is shown so you can check it by hand.

Optional. Leave blank to see the multiplier on its own.

Share of direct labor.

Share of total cost input.

Share of fully burdened cost.

Match how your own accounting system defines the base.

Wrap rate

1.853x

Every $1.00 of direct labor bills at $1.85. Before fee the multiplier is 1.716x.

How it adds up (per $1.00 of direct labor)
StepAmount
Direct laborSet to 1.00 so each line reads as a share of direct labor.1.000
Fringe30% of direct labor.0.300
Overhead20% of direct labor plus fringe.0.260
Total cost inputLabor, fringe and overhead added up. This is the G&A base.1.560
G&A10% of total cost input.0.156
Fully burdened costTotal cost input plus G&A.1.716
Fee or profit8% of fully burdened cost.0.137
Fully burdened rateCost plus fee. This is the number you bill per direct labor hour.1.853

Total markup over direct labor: 85.33%.

How the layers stack

Fringe is the cost of benefits and payroll taxes, as a share of direct labor. Overhead is the cost of running the part of the business that supports the work, such as a facility or a team lead. G&A is the cost of running the whole company, such as accounting and the owner. Fee is your profit, added last.

What this does and does not do

This does the arithmetic. Your real rates come from your books, and on cost-type contracts they are reviewed by the government. Pools and bases are defined by your own accounting system, so use the same ones it does. This is not accounting advice.